About Us

History

December 2010 Established RS Technologies Co., Ltd. with its primary business as wafer reclamation
January 2011 Launched operation at Sanbongi Factory
November 2011 Sanbongi Factory id ISO9001:2008 certified (for quality management systems) by UKAS
October 2013 Launched solar business at Sanbongi Factory
February 2014 Established RSTEC Semiconductor Taiwan Co., Ltd. (currently a consolidated subsidiary) as a reclaimed wafer manufacturing subsidiary in Taiwan
March 2015 Listed on the Mothers section of the Tokyo Stock Exchange
June 2015 Completed construction of Factory #8 of Sanbongi Factory with the introduction of state-of-the-art equipment
December 2015 Completed construction Tainan Factory of 艾爾斯半導體股份有限公司 (RSTEC Semiconductor Taiwan Co., Ltd. (currently a consolidated subsidiary))
September 2016 Modified listing to the first section of the Tokyo Stock Exchange (TSE First Section)
December 2017 Concluded a three-company joint venture agreement with 有研科技集団有限公司 (GRINM Semiconductor Materials Co., Ltd. (GRINM)) and 福建倉元投資有限公司 (Fujian Kuramoto)
January 2018 Established 北京有研RS半導体科技有限公司 (Beijing GRINM RS Semiconductor Technology Co., Ltd. (BGRS)) and made 有研半導体材料有限公司 (GRINM Semiconductor Materials Co., Ltd. (GRITEK)), a Chinese prime wafer manufacturer, into our consolidated subsidiary
May 2018 Acquired 100% shares of Union Electronics Solutions Co., Ltd. (Special agent of Hitachi Power Semiconductor Device, Ltd.)
August 2018 Established 山東有研半導体材料有限公司 (Shandong GRINM RS Semiconductor Materials Co., Ltd. (Shandong GRITEK) (Consolidated subsidiary of GRITEK))
January 2019 Acquired 100% shares of DG Technologies Co., Ltd. (DG)
December 2019 Concluded a four-party joint venture agreement with GRINM, 徳州滙達半導体股権 Investment Fund Partner Company, and Dezhou Municipal Government of Shandong Province
February 2020 Established 上海悠年半導体有限公司 (Shanghai Union)
March 2020 Established 山東有研RS半導体材料有限公司 (Shandong GRINM RS Semiconductor Materials Co., Ltd. (SGRS)) and 有研艾唯特 (北京) 科技有限公司 (Beijing IVT)
October 2020 Completed construction of and launched production at the new factory of Shandong GRITEK to serve as the prime wafer production base in China
June 2021 In preparation of GRITEK's listing, we changed its organizational structure to a corporation and its company name to 有研半導体硅材料股份公司 (English notation shall remain the same)
March 2022 Transitioned from a company with an audit and supervisory board to one with an audit and supervisory committee
April 2022 Moved to the Prime Market from the First Section of the Tokyo Stock Exchange
Established the Nomination and Compensation Committee (voluntary)
June 2022 Completed construction of the Kurihara Factory (Kurihara City, Miyagi Prefecture) as the second production base of DG